Pepsi

ETA Max Energy and Environmental Solutions provided Jordan Ice & Aerated Water Co. (JICE) with a turnkey solution of design, procurement, installation, commissioning, and 2 years maintenance for an on-grid PV system with capacity of 1.8 MWp on the rooftops to provide the manufacturing plant with electricity and to cover a part of the electricity consumption.

The PV system generates 3.2 GWh of electricity annually and saves up to 290,000 JOD/yr with a payback period of less than 4 years.

The project is a successful example of utilizing large rooftops of industrial plants in energy production resulting in savings for the industry.